Erskine Bridge Lighting and Electrical Refurbishment Contract 2016
Lightways (Contractors) Limited were awarded the Contract for the Lighting and Electrical Refurbishment of the Erskine Bridge by Transport Scotland in March 2016, with Scotland Transerv acting as Engineer for the Works and Clayton-Fourie Consultancy as sub-consultant designer. The Contract period was 20 weeks and works commenced on May 31st 2016.
Lightways (Contractors) Limited were the Principal Contractor and partnered with Marmac Services Limited who undertook the internal works whilst Lightways carried out the external works.
Other sub-contractors involved in the works were Traffic Management - Contraflow Ltd; Vehicle Recovery - M8 Recovery; Crane hire - Horizon Reinforcing & Crane Hire Co. Ltd; Bluetooth Monitoring – Tracsis; Man-rider overhaul and operating to access tower tops - Skyform (Scotland) Ltd; Barrier removal / re-erection - James Strang Ltd
The scope of the works was the refurbishment and upgrading of the existing 40 year old lighting and electrical network from the Erskine Bridge Administration Building and high mast lighting at the south end through to the A82/A898 high mast lighting at the north end.
Erskine Bridge
22 weeks to complete